Question about setting up a project if you work with 2 shifts
 
Join Date: Aug 2022
Posts: 11
hansfrap is on a distinguished road
Default Question about setting up a project if you work with 2 shifts

How do I make a project schedule when we work with 2 shifts in a day?

What do I have to do??
• Do I have to put in the Project settings that we have a working week of 80 hours with working days of 8 hours
• Or do I have to make 2 calendars (morning and evening) with working hours from 6 a.m. to 2 p.m. and from 2 p.m. to 10 p.m.?


• Or should I use both options??
• Or …….

What is the standard solution for this?
Thanks in advance for thinking along ☺️
Reply With Quote
 

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Help with Setting 4 (10) Hour Shifts dondiposton Project 1 03-31-2021 11:45 PM
12 hour shifts 2 shifts per day 7pm-7am - problems Patches37 Project 0 01-05-2018 02:02 PM
Spreading a project over two shifts bluphoto Project 1 08-21-2015 01:27 PM
12 hour work days (shifts) John Franklin Project 22 11-12-2013 03:19 PM
Question about setting up a project if you work with 2 shifts Work Offline Setting thomas34461 Outlook 1 04-04-2011 01:42 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 07:52 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft