I have several tasks within a WBS.
These tasks have no linked tasks (no predecessors and no successors). The WBS however is linked to other WBS's (1 predecessor and 1 successor). I want to link the tasks within the WBS but get the message: "These tasks can't be linked because they're already linked through another task chain" Again these task do not have any successors nor predecessors, their WBS does. I expect to be able to link these tasks within the WBS. |
|
![]() |
||||