Default What is the Work table representing

The attachment shows a view from the LRI MS schedule I have been working on. I don't understand the Work table and what it is indicating. Can someone provide what the work table indicates?

https://www.msofficeforums.com/attac...1&d=1451669252


Quote:
Originally Posted by bnkglb View Post
Julie; Thanks for the response;
The scheduler developed the view below in P6. What are the tables in MS projects that reflect the Original Duration, Remaining Duration, Budgeted Labor Units and Remaining Labor Units and how can I create that view in MS? Also what is a quick way to assign all resources 80 % and which task type is needed to keep the duration hours the same when assigning less time to the resource? In other words the estimated time that has been provided for each activity was developed by the team with the acknowledgement that there is about 20% fat in the estimated duration. This duration was used as the basis of the estimate. In order to track actuals against cost, what is the best way to setup the resource allocation?

P6 view
Activity Name,Start, Finish, OD,RD, Budgeted Labor Units,Remaining Labor Units
Attached Images
File Type: png Snag it 2016-01-01_12-09-41.png (53.4 KB, 10 views)
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Remove resource name from Gannt Bar in Project Professional 2013? nick@johansens.eu Project 1 10-16-2014 05:58 AM
[Project 2013] More accuracy with resource, unit %, and cost? How to add A fixed cost per day for the duration of the project? vdLRSA Project 3 08-11-2014 02:26 PM
[Project 2013] More accuracy with resource, unit %, and cost? Need totoal cost despite project being in progress Sognamed Project 1 07-23-2013 06:06 AM
Portfolio Analyzer Cube - Cost Resource Question seanpears99 Project 2 03-07-2013 06:59 PM
entering values for a cost type resource ketanco Project 3 12-26-2011 09:25 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 11:31 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft