Hi,

If i have a project which has two or more baselines: say Baseline 1,2 & 3. How will i find out out the total earned value (BCWP) for the entire project (till date)?

Usually, we set Earned value calculations to Baseline (by default). But, as we re-baseline the schedule, we get newer planned values, like Baseline Cost 2, Baseline Cost 3. Now, if we need to find out earned value for the baseline 3, we need to set up Earned value calculation (Tools -> Options -> Calculation -> Earned Value -> Baseline 3. What is the solution.



Please help.
Thanks in advance.

Pratik
Reply With Quote
  #2  
Old 08-22-2013, 11:18 AM
JulieS JulieS is offline Finding Earned Values for Different Baselines in a single project Windows 7 64bit Finding Earned Values for Different Baselines in a single project Office 2010 32bit
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

When you change the Earned Value calculations, it overwrites the other data. There are additional Number and Cost Fields that you could copy the Earned Value data from the differing baselines into.

To show earned value for the entire project, ensure you have the Project Summary task displayed.
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Finding Earned Values for Different Baselines in a single project Calculating earned value ketanco Project 3 08-13-2012 09:06 AM
Finding Earned Values for Different Baselines in a single project Meaning of current date vs status date when saving baselines ketanco Project 1 02-08-2012 02:20 PM
Help finding starting point on project (Excel/Access?) ndk415 Office 1 06-19-2011 03:28 AM
Finding Earned Values for Different Baselines in a single project How to count multiple values in a single cell, except zero? iuliandonici Excel 1 04-13-2011 09:45 PM
Finding Earned Values for Different Baselines in a single project Sum & difference between multiple values in a single cell iuliandonici Excel 4 04-13-2011 09:27 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:56 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2026 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft