Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-22-2013, 10:09 AM
pratik6312 pratik6312 is offline Finding Earned Values for Different Baselines in a single project Windows 7 32bit Finding Earned Values for Different Baselines in a single project Office 2007
Novice
Finding Earned Values for Different Baselines in a single project
 
Join Date: Aug 2013
Posts: 1
pratik6312 is on a distinguished road
Default Finding Earned Values for Different Baselines in a single project

Hi,

If i have a project which has two or more baselines: say Baseline 1,2 & 3. How will i find out out the total earned value (BCWP) for the entire project (till date)?

Usually, we set Earned value calculations to Baseline (by default). But, as we re-baseline the schedule, we get newer planned values, like Baseline Cost 2, Baseline Cost 3. Now, if we need to find out earned value for the baseline 3, we need to set up Earned value calculation (Tools -> Options -> Calculation -> Earned Value -> Baseline 3. What is the solution.

Please help.


Thanks in advance.

Pratik
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Finding Earned Values for Different Baselines in a single project Calculating earned value ketanco Project 3 08-13-2012 09:06 AM
Finding Earned Values for Different Baselines in a single project Meaning of current date vs status date when saving baselines ketanco Project 1 02-08-2012 02:20 PM
Help finding starting point on project (Excel/Access?) ndk415 Office 1 06-19-2011 03:28 AM
Finding Earned Values for Different Baselines in a single project How to count multiple values in a single cell, except zero? iuliandonici Excel 1 04-13-2011 09:45 PM
Finding Earned Values for Different Baselines in a single project Sum & difference between multiple values in a single cell iuliandonici Excel 4 04-13-2011 09:27 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 09:43 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2026 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft