Total Time in 2003
 
Join Date: Sep 2012
Posts: 2
JohnG513 is on a distinguished road
Default Total Time in 2003

Hi,


The duration column reflects the elapsed time of tasks but I want to look at the man days required to achieve the task (or tasks). For example I have a plan where the elapsed time for a bunch of tasks is 25 days but the total man days to do the tasks is 94 days. I want to be able to see a column which displays the 94 days.

Can anybody advise which column looks at this.

Many thanks for any help.

Cheers
John
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
display in meeting 'When' show old time on 2007-10 but not in 2003 andrelabbe Outlook 0 07-18-2012 03:01 AM
IE Object: Run-time problem (the link is not clicked in run-time but not in step-in tinfanide Excel Programming 1 03-04-2012 12:05 AM
Total Time in 2003 Error Outlook 2003 " Receive much mail the same at the same time" nhat2nhat2 Outlook 1 09-26-2011 11:10 PM
Total Time in 2003 Total Resources 602chrislys Project 1 10-04-2010 09:04 AM
Issues with Total # of Pages zehra216 Word 2 07-06-2009 08:41 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 12:24 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft