Which column shows just labor cost?
 
Join Date: Dec 2011
Posts: 279
ketanco is on a distinguished road
Default

So there is no ready column to just show labor cost? (for the costs obtained from the labor resources i entered in the resource sheet and then asigned to activities i mean)

also, when i do this calculation using fixed cost, it works because cost column alrady takes fixed cost column into account. however when i made another cost column for another type of cost, say cost1, and said labor = cost -cost1, this time when i add something into cost1, labor cost decreased. because "cost" column wasnt taking cost1 into account and i had said labor = cost - cost1. how can i tell ms project that the cost column also needs to include cost1 column?
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Assiging more than one labor of the same type ketanco Project 5 06-08-2012 01:28 PM
free slack changes when i paste from fixed cost to cost1 column ketanco Project 5 02-03-2012 06:17 AM
Can I change the horizontal scrollbar to scroll smoothly rather than column by column carpat Excel 0 01-10-2012 09:34 AM
entering values for a cost type resource ketanco Project 3 12-26-2011 09:25 AM
Which column shows just labor cost? Need to search a column for a macth and return a result from a third column pdfaust Excel 2 02-03-2011 03:02 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:41 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft