Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #4  
Old 08-30-2011, 08:34 AM
OTPM OTPM is offline Formula Help Required Windows 7 32bit Formula Help Required Office 2010 32bit
Expert
Formula Help Required
 
Join Date: Apr 2011
Location: West Midlands
Posts: 981
OTPM is on a distinguished road
Default

Hi Both
Sorry for the delay in responding. Thanks for the suggestions so far however it does not give me what I need. Perhaps I did not explain clearly enough.
Basically I need to return an answer of "Yes" if the same resource is assigned to tasks on different projects (Column C) during the same time periods Columns H and I.
Hope this makes it clearer.
Kind regards
Tony(OTPM)
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Sum required without consider the negative amount PRADEEPB270 Excel 2 08-22-2011 04:23 AM
Formula Help Required Help required with spacing rohanmalhotra Word VBA 3 08-11-2011 04:06 AM
Help required with mobile powerpoint scrichens PowerPoint 0 05-17-2011 02:58 AM
Suggestion required domex Word 0 10-06-2010 05:35 AM
Urgent Help Required id12345 Word 4 12-29-2009 08:22 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:44 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft