Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 03-27-2018, 08:47 AM
DBenz DBenz is offline X axis graph all dates when date column contains specific dates..possible ? Windows 7 64bit X axis graph all dates when date column contains specific dates..possible ? Office 2010 32bit
Advanced Beginner
X axis graph all dates when date column contains specific dates..possible ?
 
Join Date: Dec 2014
Posts: 69
DBenz is on a distinguished road
Default X axis graph all dates when date column contains specific dates..possible ?

Hi,
Column A has dates 365 per year. B has meter readings (sporadic), C has days between readings, D has gas used between readings, E has gas per day.



So as to make the calculation of C and D and E easy, with formula referring to the cell above, so copy paste repeatable down the entire column, I opted to filter rows in B with 0 in it then delete those rows.
Col A will be the X axis in a graph BUT I want the X axis to feature 365 days, with the rows populating the appropriate date on that axis, with gas used per day for the Y axis is this possible ?

Otherwise can I somehow filter out the rows with 0 in for B, so that I can do that formula act as planned, referring to the row above that does have a figure to work on, something like filter find row with 0 in B column, then hide row and exclude row from being seen by formula ?

DBenz
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
X axis graph all dates when date column contains specific dates..possible ? Timeline - loop through all dates between first and last given and add date to column if not found carlos_cs Excel Programming 1 05-03-2016 09:25 AM
Autofill dates - how can I get the same date and consecutive dates? Exhale Excel 3 04-05-2016 03:11 AM
Proportionally spread dates on chart x-axis? jhoby Excel 0 06-07-2015 01:04 PM
Is this possible? - Calculate and Display the date range between 2 specific dates Premier-UK Excel 2 08-18-2014 05:43 AM
X axis graph all dates when date column contains specific dates..possible ? column clustered bar graph with a line graph as secondary axis Alaska1 Excel 2 06-09-2014 07:13 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:53 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft