Microsoft Office Forums

Go Back   Microsoft Office Forums > >

Reply
 
Thread Tools Display Modes
  #1  
Old 08-23-2018, 06:24 AM
Tunathedog Tunathedog is offline Contextual searches for Find and Replace Mac OS X Contextual searches for Find and Replace Office for Mac 2011
Novice
Contextual searches for Find and Replace
 
Join Date: Apr 2016
Posts: 10
Tunathedog is on a distinguished road
Default Contextual searches for Find and Replace

As a copy-editor, I frequently have to do things like change "20-21" to "20–21", or simply replace one number or letter in the middle of a string, where the bits both before and after the character may vary.




Although I can use "any digit" or "any letter" to create the search string, I can't see any way to create a compatible replace string. "Find what text" recreates the entire string, so it's not possible to change a character in the middle.



Does anyone have any suggestions?
Reply With Quote
  #2  
Old 08-23-2018, 06:29 AM
macropod's Avatar
macropod macropod is offline Contextual searches for Find and Replace Windows 7 64bit Contextual searches for Find and Replace Office 2010 32bit
Administrator
 
Join Date: Dec 2010
Location: Canberra, Australia
Posts: 22,525
macropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond repute
Default

For the example you gave, use a wildcard Find/Replace, with:
Find =([0-9])-([0-9])
Replace = \1–\2
__________________
Cheers,
Paul Edstein
[Fmr MS MVP - Word]
Reply With Quote
  #3  
Old 08-27-2018, 05:58 AM
Tunathedog Tunathedog is offline Contextual searches for Find and Replace Mac OS X Contextual searches for Find and Replace Office for Mac 2011
Novice
Contextual searches for Find and Replace
 
Join Date: Apr 2016
Posts: 10
Tunathedog is on a distinguished road
Default

Thanks! That would do the trick.
Reply With Quote
Reply

Tags
find and replace, findwhattext, wildcards



Similar Threads
Thread Thread Starter Forum Replies Last Post
In Find and Replace, can Word stop after each Replace? wardw Word 1 06-08-2017 02:47 PM
Contextual searches for Find and Replace New to VBA - Find/Replace in MS Word 2010 that Searches Header/Footer mbreggs Word VBA 4 06-01-2016 08:02 AM
Contextual searches for Find and Replace Find what box in Find and replace limits the length of a search term Hoxton118 Word VBA 7 06-10-2014 05:05 AM
Contextual searches for Find and Replace Bad view when using Find and Find & Replace - Word places found string on top line paulkaye Word 4 12-06-2011 11:05 PM
Contextual searches for Find and Replace Help with find and replace or query and replace shabbaranks Excel 4 03-19-2011 08:38 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 03:59 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft