Microsoft Office Forums

Go Back   Microsoft Office Forums > >

Reply
 
Thread Tools Display Modes
  #1  
Old 05-02-2017, 12:05 AM
DragonInCresent DragonInCresent is offline Change the order of Table-of-Content according to Most-Visited titles Windows 7 64bit Change the order of Table-of-Content according to Most-Visited titles Office 2013
Novice
Change the order of Table-of-Content according to Most-Visited titles
 
Join Date: May 2017
Posts: 5
DragonInCresent is on a distinguished road
Default Change the order of Table-of-Content according to Most-Visited titles

Dear All;



I have a word document in which I keep short paragraphs and essays. and for easy reference I made a title for each paragraph, setting it with Header1 formatting. every time I add a new paragraph, I update the Table of Content, so the table of content is kept up-to-minute as the document is growing.

Usually I CTRL + CLICK on the title in the table-of-content to reach to the desired paragraph.

now I am thinking how to sort the table of content, not by the order in the document, but rather by the most-visited title. so the title I revise it frequently should appear at the top of Table-of-Content...

please advise..

thanks in advance
Reply With Quote
  #2  
Old 05-02-2017, 03:49 AM
macropod's Avatar
macropod macropod is offline Change the order of Table-of-Content according to Most-Visited titles Windows 7 64bit Change the order of Table-of-Content according to Most-Visited titles Office 2010 32bit
Administrator
 
Join Date: Dec 2010
Location: Canberra, Australia
Posts: 22,527
macropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond repute
Default

The only way you'll get that to happen is by manually re-arranging the content in the desired order.
__________________
Cheers,
Paul Edstein
[Fmr MS MVP - Word]
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Change the order of Table-of-Content according to Most-Visited titles Content Control Field Names/Titles Word Form shammi_raj Word VBA 3 03-10-2016 02:54 AM
Change the order of Table-of-Content according to Most-Visited titles How do I get column titles to show up in my pivot table? nrcahill Excel 3 03-07-2016 09:35 AM
Pivot Table Question- Can the table display in the order the boxes were checked/selected? blackjack Excel 0 09-13-2014 08:57 PM
Change the order of Table-of-Content according to Most-Visited titles macro for change content of cell2 when content of cell1 changes Intruder Excel Programming 1 11-17-2012 08:24 PM
Change the order of Table-of-Content according to Most-Visited titles Content control titles jillapass Word VBA 3 05-29-2012 06:11 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 08:46 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft