Microsoft Office Forums

Go Back   Microsoft Office Forums > >

Reply
 
Thread Tools Display Modes
  #1  
Old 03-09-2017, 10:02 PM
adzialo adzialo is offline Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc Mac OS X Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc Office for Mac 2011
Novice
Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc
 
Join Date: Mar 2017
Posts: 1
adzialo is on a distinguished road
Default Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc

Hi,

Whenever I try to apply certain formats to specific sections of a document, it ends up affecting the majority of the document. For example, say I want one of paragraphs to be double spaced. I'll highlight the paragraph, hit Double Space, and it will be applied to the whole document. This happens with bullets points and centering as well. I'll try to apply bullets to a highlighted section, but instead the bullet goes to the top of the page and indents everything.



I'm in the Normal style, so I don't believe it's a matter of unchecking "Automatically Update". Also, I don't have this problem with Font, Bold, Italic, etc.

Any ideas how to fix this? Thanks!
Reply With Quote
  #2  
Old 03-15-2017, 04:15 PM
Stefan Blom's Avatar
Stefan Blom Stefan Blom is offline Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc Windows 10 Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc Office 2013
Moderator
 
Join Date: Aug 2011
Posts: 4,049
Stefan Blom is a name known to allStefan Blom is a name known to allStefan Blom is a name known to allStefan Blom is a name known to allStefan Blom is a name known to allStefan Blom is a name known to all
Default

In the Modify Style dialog box, look for an option that says "Update automatically." Since I'm not using Word for Mac, I can't give more specific advice, I'm afraid.
__________________
Stefan Blom
Microsoft Word MVP

Microsoft 365 apps for business
Windows 11 Professional
Reply With Quote
  #3  
Old 05-01-2017, 12:53 PM
Scott Tiner Scott Tiner is offline Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc Windows 7 64bit Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc Office 2013
Novice
 
Join Date: May 2017
Posts: 1
Scott Tiner is on a distinguished road
Default

Quote:
Originally Posted by Stefan Blom View Post
In the Modify Style dialog box, look for an option that says "Update automatically." Since I'm not using Word for Mac, I can't give more specific advice, I'm afraid.
To clarify, uncheck the checkbox to prevent Word from automatically updating globally. (Stefan, correct me if I'm wrong.) However, as a convenience, you don't need to uncheck the box if, after you apply the change, you press Ctrl-Z to undo. This is because when you apply the change, Word performs a two-step process that looks like it's a single process: 1) it applies the change to the individual paragraph and then 2) it applies the change globally. When you undo, you're undoing the global change. I just read this on a forum, but I can't find it now :-)
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Change paragraph spacing on all paragraphs clive Word 3 04-21-2016 03:01 PM
Centering photo without centering document Magnumcoffee1962 Word 3 09-13-2014 08:26 PM
Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc When 1 Person Opens or Sends a Doc the Bullets Indent Spacing Possible Tabs are not spaced as before KronosQueen Word 3 08-07-2014 10:25 AM
Trouble Formatting Specific Paragraphs - Bullets, Spacing, Centering, etc outlook double spacing paragraphs GWBDIRECT Outlook 3 04-06-2011 11:29 AM
Trouble with spacing inbetween words. riff88 Word 3 12-21-2009 12:29 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:31 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft