![]() |
#1
|
|||
|
|||
![]() Is it possible to post date a letter by 7 days by using fields? If not by using fields, is it possible to do this by using VBA code? The background: When preparing financial accounts for self managed superannuation funds we prepare two packs for a clients. The first pack needs to be signed by our clients and sent back to our office before we send out the second pack. It is easier and more efficient to prepare both packs at the same time. Therefore I am looking for a way to post date the documents in the second pack by 7 days. |
#2
|
||||
|
||||
![]()
Both are possible. To see how to do this and just about everything else you might want to do with dates in Word using fields, check out my Microsoft Word Date Calculation Tutorial, at:
http://windowssecrets.com/forums/sho...ation-Tutorial or: http://www.gmayor.com/downloads.htm#Third_party Do read the document's introductory material.
__________________
Cheers, Paul Edstein [Fmr MS MVP - Word] |
![]() |
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
![]() |
MrClever | Office | 10 | 04-21-2014 03:41 PM |
PP for dummies, 1st post | xlancealotx | PowerPoint | 0 | 12-20-2010 03:06 PM |
![]() |
Lynn O'Shea | Word | 3 | 05-18-2010 12:32 AM |
Misplaced Post Code | Doc John | Word | 0 | 02-05-2009 05:38 AM |