![]() |
|
#3
|
||||
|
||||
|
If you want to put the text INSIDE the shape then you will need to work out a scale that works for both the smallest and largest sizes. You will have more flexibility if the text is sitting beside the shapes or your shapes are using a more complex formula to set absolute minimum or maximum sizes. For instance, your shape's height could be set to
Code:
=BOUND(Prop.Width,0,FALSE,10 mm,100 mm)
__________________
Andrew Lockton Chrysalis Design, Melbourne Australia |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Graphic shapes are not updating when external Excel data is updated | cjs | Visio | 0 | 12-29-2021 06:29 PM |
| Visio Shapes for | eislexus99 | Visio | 1 | 11-07-2019 08:51 PM |
| Visio Pro 2016: Measuring the total length of a series of interconnected lines | busander | Visio | 3 | 07-11-2017 09:53 AM |
| Excel Worksheet is not displaying data and rows are changing to 409.5 height instead of the 13.5 | needexcelhelp | Excel | 1 | 06-18-2017 12:48 PM |
| Linking/Assigning Excel data 2 shapes (Timeline functionality) | mediaset23 | Visio | 0 | 07-31-2015 04:18 AM |