Having problems with Duration calculations.
 
Join Date: Mar 2006
Posts: 2
bgane
Default Having problems with Duration calculations.


I have Type set to Fixed Work, as I want Duration to adjust based on the Resources I add to the ask, leaving the Work static. I have one resource setup to work 8hrs/day, and a second resource to work 4hrs/day. I set the Work to 5d for a task. However, when I assign Resource 1 and Resource 2 to the task, each @ 75%, the Duration is set for 3.33d. I would assume it should be set for 4.44d based on 40hrs (5d) / 9hrs (6hr + 3hr). Where am I going wrong with my calculations?
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Outlook Problems komptek Outlook 0 10-30-2007 03:28 PM
Having problems with Duration calculations. Signature problems kim11vagabond Outlook 1 01-17-2007 02:53 PM
Having problems with Duration calculations. Word Editor Problems steve@pubagain Outlook 2 10-19-2006 11:32 PM
Problems w/BCM updates? Godwulfe Outlook 0 08-04-2006 09:22 AM
Having problems with Duration calculations. Problems with Bcc beadsworldwide Outlook 3 02-01-2006 03:34 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 07:51 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft