Having problems with Duration calculations.
 
Join Date: Mar 2006
Posts: 2
bgane
Default

More details: best I can tell, it's taking the complete time period (ex: 80hrs), and splitting it evenly over the two resources (ex: 40hrs each), and then the duration is based on whoever takes the longest to complete their 40hrs. That's not what I want. I want the duration to calculate based on their combined hrs/day (ex: they combine for 9hrs/day, how long to complete 80hrs). Any suggestions would be greatly appreciated. This is driving me crazy.
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Outlook Problems komptek Outlook 0 10-30-2007 03:28 PM
Having problems with Duration calculations. Signature problems kim11vagabond Outlook 1 01-17-2007 02:53 PM
Having problems with Duration calculations. Word Editor Problems steve@pubagain Outlook 2 10-19-2006 11:32 PM
Problems w/BCM updates? Godwulfe Outlook 0 08-04-2006 09:22 AM
Having problems with Duration calculations. Problems with Bcc beadsworldwide Outlook 3 02-01-2006 03:34 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:15 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft