Non-default working time problem
 
Join Date: Mar 2010
Posts: 3
Asterix is on a distinguished road
Unhappy Non-default working time problem

Most tasks in my MPP use the standard calendar, a few use a calendar I've created called "Weekends included" (where saturdays and sundays have been made non-default working time, 0800 - 1200 and 1300 - 1700).



The tasks are assigned correctly to the calendars.

2 of the tasks assigned to the weekends included calendar are dependant.

The predecessor is a "0d" milestone and is constrained to start no earlier than Sunday (in this case 7/3/10). There is no lag in the dependancy. There is no constraint on the successor, which is a "2h" duration task.

Having magnified the GANTT view, the predecessor does indeed occur on Sunday at 0800, but the successor then waits until Monday at 0800 to start (I expected it to occur between 0800 and 1000hrs on Sunday).

What have I done wrong?

I would've expected the
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Problem with Office 2007 Default Settings Something Office 0 10-23-2009 07:57 PM
Resetting to Default State not working carlgrossman Word 0 08-02-2008 01:31 AM
Canoscan default problem Hutchie Office 0 10-29-2006 05:01 PM
Reminder "snooze time" problem Steven Wild Outlook 0 03-08-2006 03:59 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 09:56 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft