I have been assigned the wonderful task of compiling a full resource listing for all of our works that can be added to our standard Project layout.
We have a number of resources available that need inserting as a group- for example surfacing requires a paver, roller, supervisor and 7 general operatives. Excavation requires excavator, dumper, supervisor, machine operator, general operative, or may be amended to large excavator for other works. If I have resources that cover the above separately, (so resources would be general operative, machine operator, paver, excavator etc), can I set up resourcing so that a set of resources can be added? Grouping is already being used (this defines the subcontractor) but that could be amended if necessary. thanks |
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
![]() |
Yaroslav | Project | 1 | 01-25-2015 11:49 AM |
![]() |
joday48 | Project | 6 | 08-19-2014 05:49 AM |
Resource Assignment Summary Line Not Adding Up Correctly | PeteS | Project | 2 | 07-18-2014 06:24 AM |
Multiple resource Dependencies / Mapping | Sherry | Project | 3 | 04-03-2014 08:03 AM |
Master Schedule and Multiple Resource Pools | calebhuzzah | Project | 1 | 06-23-2013 10:10 AM |