Sorry for being a bit late, work piled up a bit last week.

I have had a look, and think we might have something that will work.
First thing is to remove the summary task links. This maintains task relationships, and summary's can get confusing. a link between tasks is a "real" link- x follows y- a link between summary's is slightly different.

Looking at the constraints- you have the pick up date as "no earlier than" which is fine. I have linked this as predecessor of all phase 2 tasks, which keeps them in line. Phase 3 follows from 2, so they will automatically line up.

Phase 1 did make me think. Setting "as late as possible" was pushing phase 2 out, as this forces everything after it out as far as possible so destroys the phase 2 link. If we link the phase 1 activities to the Pick up date, and then set "as late as possible", it works again as the pick up date is the restraint. I have included this as the first solution.

SUMMARY
Removed the summary links, replace with task links
Phase 1 tasks linked so that Pick Up date is a successor to them, then set phase 1 tasks "as late as possible" (note that you only actually need to change the first task, anything following will be pushed back)

Thats about it.

The one thing that does occur is that the phase 3 dates change, I dont know if this is what you wanted but it does link them correctly. See how it goes, can always change it around again.

Oh- the board now allows mpp files to be uploaded, so no need to zip any more.
Attached Files
File Type: mpp nantia_problem2.mpp (292.0 KB, 11 views)
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Excel Gantt Chart Help kpk250 Excel 0 03-08-2013 08:46 AM
Gantt chart - reverse tasks dependency checking tasks complete from main gantt view sundance1 Project 1 01-29-2013 10:31 AM
Bar in the Gantt chart with the duration ms_user Project 3 01-11-2013 06:31 AM
move to first date on gantt chart etsoft Project 3 12-23-2011 08:32 AM
Showing unscheduled tasks on Gantt chart jaworski_m Project 0 11-20-2011 12:37 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 01:05 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft