Sorry, no. Project is designed to plot tasks (surveys in your case) against time. One possible structure is to have the Properties as summary tasks with the specific surveys listed as subtasks. As it doesn't sound like there is any relationship between the surveys (they are no dependent upon one another) you might consider using Manually Scheduled tasks (assuming you have Projec 2010 or 2013).

I'd be curious as to why the client wants you to use Project? This does not, strictly speaking, sound like the classic use.
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Project layout getting started. How to start a Userform when Word is started dherr Word VBA 7 12-15-2014 03:16 AM
Project layout getting started. Getting started... Annby Project 3 11-06-2014 03:38 PM
Project layout getting started. Page footers have started ravl13 Word 3 11-21-2013 12:31 PM
Project layout getting started. entering future dates for a project that has started ketanco Project 5 12-15-2011 07:16 PM
Need Help Getting Started, Please. Thanks ChunkyZergling Outlook 1 04-24-2009 07:38 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 10:32 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft