  #1  
Old 08-18-2014, 06:55 AM
caveman caveman is offline How to Input Actual Overtime Work Windows 7 64bit How to Input Actual Overtime Work Office 2010 64bit
Novice
How to Input Actual Overtime Work
 
Join Date: Aug 2014
Posts: 5
caveman is on a distinguished road
Smile

Quote:
Originally Posted by JulieS View Post
You are working with Manually scheduled tasks. Set the task to Autoscheduled and you'll be able to add Actual Overtime work.
Okay I unticked the Manually Scheduled checkbox and is able to add Actual Overtime Work. But now I'm confused:

Ovt. Work is 5h,


Baseline Work is 8h,
Why is the Actual Work is 12h, not 13h?
Is the formula for Actual Work = Baseline Work + Overtime Work? Or am I missing something?

I am very sorry for asking very basic questions, but as I mentioned before, I am really new at using MS Project.
Attached Images
File Type: jpg schedule2.jpg (118.2 KB, 23 views)
Reply With Quote
Reply

Tags
actual, overtime, projet



Similar Threads
Thread Thread Starter Forum Replies Last Post
Actual working hours per day climbatron Project 2 12-17-2015 03:13 PM
How to Input Actual Overtime Work about usage of Timesheet and Overtime in Project server Hyung-Ho Yoon Project 3 07-15-2014 09:13 AM
Actual work in the future joday48 Project 3 07-06-2012 06:00 AM
How to Input Actual Overtime Work overtime work effecting task duration user0044 Project 11 03-06-2012 07:20 AM
MS Project able to import actual start and or actual finish date from Excel? mhacker Project 0 04-26-2010 11:29 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:43 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft