#1
|
|||
|
|||
|
I need to produce resource visual reports in Project 2013, which is simple enough, however the vertical scale is always in man hours, whereas I need it in man days.
Can I set the report up to give me days? Currently I set the hours axis to hours/wk (usually default), then print as a pdf and edit t give me a day count. This takes to long and every time there is a change, I need to repeat the whole process. thanks
|
|
|