If you are referring to summary task % complete calculations, no, you cannot exclude tasks from those calculations. You could create another project with the fabrication details and with cross project links to the construction project.

Physical % complete is not calculated by Project it is an optional method of calculating Earned Value. If you use durations only, then the only automatic method is % complete.
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
showing fabrication items in schedule Getting Error when I schedule a meeting in outlook ms3433 Outlook 1 09-05-2013 11:03 AM
outlook renaming all categories to schedule aircm Outlook 0 05-09-2012 07:45 PM
Need to Create a Resource Driven Schedule gamer83 Project 2 05-24-2011 03:56 AM
Powerpoint project schedule L J Keane Project 0 09-14-2010 01:24 AM
Outlook 2007 Saved sent items list only holds the last ten items david.peake Outlook 0 06-01-2010 07:27 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 08:49 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft