Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #3  
Old 02-20-2014, 02:06 PM
Intruder Intruder is offline work during weekend outside normal calendar Windows XP work during weekend outside normal calendar Office 2007
Advanced Beginner
work during weekend outside normal calendar
 
Join Date: Dec 2010
Posts: 59
Intruder is on a distinguished road
Default

thx Julie, I created an additional weekend calendar to assign tasks to. However, the amount of work (e.g.) does not match with the size of the task bar, the length will always be full day work (8 h) even when I put the task to 0 or 2 hours. Why is that ?
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
showing calendar days by keeping normal workday calendar ketanco Project 11 11-01-2013 08:27 AM
Calendar work days in advance paol:o Outlook 4 05-27-2012 07:23 PM
Calculating Weekend Allowance WinIDS Excel 6 09-02-2011 01:27 AM
Change Calendar to 4 day work week J C M Outlook 1 04-28-2011 02:20 PM
Code to auto-forward weekend messages Whang Outlook 0 06-16-2010 02:18 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 09:03 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft