Old 02-20-2014, 02:06 PM
Intruder Intruder is offline work during weekend outside normal calendar Windows XP work during weekend outside normal calendar Office 2007
Advanced Beginner
work during weekend outside normal calendar
 
Join Date: Dec 2010
Posts: 59
Intruder is on a distinguished road
Default

thx Julie, I created an additional weekend calendar to assign tasks to. However, the amount of work (e.g.) does not match with the size of the task bar, the length will always be full day work (8 h) even when I put the task to 0 or 2 hours. Why is that ?
Reply With Quote
  #2  
Old 02-20-2014, 02:13 PM
JulieS JulieS is offline work during weekend outside normal calendar Windows 7 64bit work during weekend outside normal calendar Office 2013
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

Are you referring to the length of the bar in the Gantt chart? Try right clicking in the back ground of the Gantt chart and selecting Layout. Uncheck "round bars to whole days".
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
showing calendar days by keeping normal workday calendar ketanco Project 11 11-01-2013 08:27 AM
Calendar work days in advance paol:o Outlook 4 05-27-2012 07:23 PM
Calculating Weekend Allowance WinIDS Excel 6 09-02-2011 01:27 AM
Change Calendar to 4 day work week J C M Outlook 1 04-28-2011 02:20 PM
Code to auto-forward weekend messages Whang Outlook 0 06-16-2010 02:18 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 12:47 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft