#1
|
|||
|
|||
|
Hope someone can help -
i have just completed a plan ( fully linked with predessors and sucessors) My superior has asked me to split them out into different wbs strings. When I either cut and paste or copy into a different ID line- the links do not move with the task:confused what am I doing wrong Andy ![]() |
|
|