Hi
I have been amending our current project template to allow easier updating methods for our PM community. The current set up of our template has been desigined to assist in the generation of our fortnightly status reports which are generated into a BI SQL Report.


My question, one of the sections I need to amend is a section based around Stage Budgets, this section previously had 6 tasks, Stage 1 - 6 and 4 and cost resources were assigned to each task and this section was maintained outside of the normal schedule activites (i.e. at the top of the template away from the main body). In here the PMs would add Opex and Capex costs, publish and then regenerated the status report following a cube rebuild.
My change was to remove this section, and allocate the cost resources to the actual Stage 1-6 of the schedule, each stage incorporating the rest of the delivery tasks for each stage. i.e. I was now allocating the cost resources to the summary activities of each stage.
Now after I publish and rebuild, the summary level cost information is not contained within the cube, can someone tell if it is ok to allocate cost resources to summary activities (this is only to subtantiate the report which aggregates the data over years based upon the duration of the summary activity).
If so, where can I ensure that the summary level info is included in the cube (or is this not possible?)
Thanks
Sean
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Portfolio Analyzer Cube - Cost Resource Question cost loading of non scope items ketanco Project 3 08-24-2012 05:55 AM
Which column shows just labor cost? ketanco Project 9 06-20-2012 02:19 PM
How to rename cost column ketanco Project 3 06-15-2012 03:06 PM
entering values for a cost type resource ketanco Project 3 12-26-2011 09:25 AM
Portfolio Analyzer Cube - Cost Resource Question Common mailbox analyzer/statistics NoStr0m0 Outlook 3 09-23-2011 05:22 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 03:08 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft