Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-15-2012, 08:05 AM
ketanco ketanco is offline correcting split tasks Windows 7 64bit correcting split tasks Office 2007
Expert
correcting split tasks
 
Join Date: Dec 2011
Posts: 279
ketanco is on a distinguished road
Default correcting split tasks


when i was updating one of my schedules, some of the tasks got splitted although i didnt want (which are now complete). there are quite a few of them.

1-how can i make those past 100% tasks show as continuous bars? is there a shortcut to do all of them at once? or should i go to them one by one?

2-whatever the answer is for question 1, what is the best method to do that?
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Priority based levelling for split tasks having actuals proj12 Project 3 02-27-2012 06:47 AM
Export Excel tasks into Outlook Tasks (2007 Version on both) crazedmom Excel 0 12-29-2011 07:55 AM
Split a task fridos Project 2 05-30-2011 11:19 AM
correcting split tasks voice control: correcting mispelled words persist Word 1 05-11-2011 04:58 AM
correcting split tasks How to stop correcting zeroes in cells ? kevin_ms Excel 4 09-14-2008 10:08 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 04:37 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft