Intruder Intruder is offline allocate 0% to resource results in 99% complete ? Windows XP allocate 0% to resource results in 99% complete ? Office 2007
Advanced Beginner
allocate 0% to resource results in 99% complete ?
 
Join Date: Dec 2010
Posts: 59
Intruder is on a distinguished road
Default

if there is zero work and zero duration for a summary task, how is it possible it would not be be marked as 100% complete but 99% ? is this a bug in project ?
Reply With Quote
 

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
allocate 0% to resource results in 99% complete ? % Complete (Actual) vs % Complete (Should) Carlos Maximo Project 3 12-06-2011 12:01 PM
Search results disappearing Emerogork Office 3 07-17-2011 03:52 PM
Equally allocate/assign across resouces chconnors Project 1 06-01-2011 03:27 AM
allocate 0% to resource results in 99% complete ? Sort by criteria: number of results p0k Excel 1 10-22-2009 08:33 PM
filesaveas method for ms project in c# results in error mikimik Project 0 10-12-2006 07:53 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:52 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft