skoz55 skoz55 is offline Adjusting All Durations by 10% Windows 7 64bit Adjusting All Durations by 10% Office 2010 64bit
Novice
Adjusting All Durations by 10%
 
Join Date: Jan 2009
Posts: 20
skoz55 is on a distinguished road
Default Adjusting All Durations by 10%

I am a home builder and every project create 3 schedules for one project. The 100% (actual planned time), 110% (schedule I show the client), and 90% (schedule that I ask my PM to shoot for).



Is there an easy way to adjust the 100% schedule larger or smaller by 10% w/o adjusting every tasks duration and w/o losing the original 100%?
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Milestone durations fraserm Project 4 01-13-2012 08:43 AM
Task and Summary Durations JR_12 Project 0 10-15-2011 05:07 PM
Can't change period when adjusting actual time in Web Access chip_saffire Project 0 10-04-2011 12:05 AM
Calculate slide durations for song hb2010 PowerPoint 1 10-19-2010 06:41 AM
Adjusting Tabs erselking Word 1 10-23-2008 02:57 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:26 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft