I have a date that is pulled through as part of a merge field as follows:



and payable on the { MERGEFIELD Contract_DemandDate\@ "d" \Ordinals } day of each month by standing order

The day is split off as expected but for some reason this does not seem to add the ordinals on the end. The merge field is a date and splitting off the day doesn't seem to be a problem but it's almost as if the ordinals and the mergefield are processed at the same time so the ordinals can't be applied to the split off day.

Any help would be appreciated.
Reply With Quote
 

Tags
date cell formatting, mergefields, ordinals



Similar Threads
Thread Thread Starter Forum Replies Last Post
Mail merge how to link mail merge field value to a column heading dsummers Mail Merge 1 05-08-2014 02:59 PM
Date field inserting merge date in blank field Lesley Mail Merge 5 09-30-2013 01:49 AM
Ordinals Applied to Merge Field How to ignore a mail merge field if the field is blank redzan Mail Merge 1 05-16-2013 08:34 AM
Merge field source data field kckay Mail Merge 4 03-25-2013 11:06 AM
Ordinals Applied to Merge Field How big can a mail merge field be? Engineer Mail Merge 2 12-11-2012 01:20 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 04:47 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft