#1
|
|||
|
|||
MERGESEQ does not appear to be having a value assigned
I have been trying to set up a directory by following the tutorial. When I had no success I used the tutorial document and dataset, pasted the first section of code. The conditional statements are not working in the same way that my attempts were not working. As far as I can tell no value is being assigned to MERGESEQ. To test it out I added a field {MERGESEQ} which remains blank during the preview of the merge.
Is this a valid way of checking my assumption? If so what could be stopping the value being assigned? Any assistance would be much appreciated. Attached is screenshot |
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Task types with no Resources assigned | mtaylor | Project | 1 | 05-24-2014 12:37 PM |
I am unsure I assigned a task out to a resource. | jsteczak | Project | 3 | 10-05-2012 04:41 AM |
MS Project Crash after resource sheet assigned | Imagios | Project | 7 | 04-30-2012 06:58 AM |
Task Form disappearing when assigned | zoids | Outlook | 0 | 03-27-2011 05:01 PM |
Hyperlink assigned sounds do not play | Starscream | PowerPoint | 0 | 03-08-2011 02:14 PM |