Microsoft Office Forums

Go Back   Microsoft Office Forums > >

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2  
Old 10-06-2023, 08:43 PM
Logit Logit is offline Work/task in progress tracker Windows 10 Work/task in progress tracker Office 2007
Expert
 
Join Date: Jan 2017
Posts: 591
Logit is a jewel in the roughLogit is a jewel in the roughLogit is a jewel in the roughLogit is a jewel in the rough
Default

Utilize the attached as a basis to build off of. First third color can be red; Second Third color can be yellow; Third third color can be green.
Attached Files
File Type: xlsm Training.xlsm (10.4 KB, 7 views)
Reply With Quote
 

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Progress Status of Task Heading Marcelle Project 1 05-06-2023 10:48 AM
Project Summary Task formula to show milestone progress joday48 Project 1 01-21-2022 10:35 AM
Work/task in progress tracker Calculating work in progress between two dates PowerStar Excel 7 06-07-2021 04:03 AM
tracking progress - percent complete of a task started earlier than scheduled eblack89 Project 0 04-04-2018 03:25 PM
Work/task in progress tracker updating task progress ketanco Project 1 08-16-2012 05:09 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:07 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft