Microsoft Office Forums

Go Back   Microsoft Office Forums > >

Reply
 
Thread Tools Display Modes
  #1  
Old 08-27-2018, 01:06 AM
eckky eckky is offline Printing labels problems in W7 Windows 7 32bit Printing labels problems in W7 Office 2013
Novice
Printing labels problems in W7
 
Join Date: Aug 2018
Posts: 3
eckky is on a distinguished road
Default Printing labels problems in W7

Hi all,
I'm trying to print labels in W.7 using the mail merge tab.
I'm not trying to do a mail merge , all I want to do is print text onto a sticky label



My problem is that when I insert the text for the label the bottom line is always out of line to the left . It does not matter if the text is copied and pasted into the label text box or entered direct the bottom line is always 5/6 mm to the left. If there is only 2/3/4 or 5 lines its always the last line which is out .

If I enter the text then press the new document it then shows in the new document as the last line still to the left.

Its a recent problem as I have been printing labels this way before with no problem and I don't think anything has changed

Its a cannon printer

Any suggestions would be appreciated

Eckky
Reply With Quote
  #2  
Old 08-27-2018, 05:42 AM
macropod's Avatar
macropod macropod is offline Printing labels problems in W7 Windows 7 64bit Printing labels problems in W7 Office 2010 32bit
Administrator
 
Join Date: Dec 2010
Location: Canberra, Australia
Posts: 22,521
macropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond reputemacropod has a reputation beyond repute
Default

Are you sure your document is set for the correct stationery size and that you haven't set Word to 'Scale content for A4 or 8.5 x 11in" paper sizes'?
__________________
Cheers,
Paul Edstein
[Fmr MS MVP - Word]
Reply With Quote
  #3  
Old 08-27-2018, 08:46 AM
eckky eckky is offline Printing labels problems in W7 Windows 7 32bit Printing labels problems in W7 Office 2013
Novice
Printing labels problems in W7
 
Join Date: Aug 2018
Posts: 3
eckky is on a distinguished road
Default

Hi Macropod,

Thanks for replying,

I've checked the settings and they are A4 and not ticked for scaling ( in the print settings in page setup )

eckky
Reply With Quote
  #4  
Old 08-27-2018, 09:54 AM
eckky eckky is offline Printing labels problems in W7 Windows 7 32bit Printing labels problems in W7 Office 2013
Novice
Printing labels problems in W7
 
Join Date: Aug 2018
Posts: 3
eckky is on a distinguished road
Default

Hi All,

I've found a way that prints properly and works properly, maybe some one can tell me how it works ?
First I type the text into word , select the text plus the start of the blank line below the last line of text and paste that into the label box.

It works correctly but why ? Any ideas ?

eckky
Reply With Quote
  #5  
Old 08-27-2018, 11:55 AM
Charles Kenyon Charles Kenyon is offline Printing labels problems in W7 Windows 10 Printing labels problems in W7 Office 2013
Moderator
 
Join Date: Mar 2012
Location: Sun Prairie, Wisconsin
Posts: 9,584
Charles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant futureCharles Kenyon has a brilliant future
Default

Why?


Because there is formatting including an initial indent in the material you copied. That formatting is in the paragraph mark at the end. If you copy the paragraph mark, you copy the formatting.



Showing non-printing formatting marks in Microsoft Word



Basic Concepts of Microsoft Word - from Shauna Kelly
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Printing labels problems in W7 'Creep' when printing business cards/labels Mokaikai Word 4 07-22-2016 08:08 AM
Printing labels problems in W7 Printing Single Labels dazwm Mail Merge 3 02-25-2014 01:23 AM
problem printing labels- help Shinyspoke Word 0 11-07-2013 11:32 AM
problem printing labels using mail merge renee.g Mail Merge 1 05-08-2013 01:33 AM
Printing labels problems in W7 Mail Merge Skipping 2 Labels when Printing mbsfirst Mail Merge 3 12-27-2010 04:28 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 04:38 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft