#1
|
|||
|
|||
![]()
Hi,
I'm using the MS Word SW to show an exploded view of large 3D Assembly instead of CAD SW (in this case solidworks) due to the high sub-assembly qty, it's impossible to do this. Using the Word I'm generating a manual Balloons with its arrow and the images taken from the CAD SW, now I'm also showing the Bill of Material of this assembly (Table with all the P/N). now, Because I'm doing it all manually I don't have any synchronization between the Balloon No. to the index No., now think having a mistake in balloon 20/250 and 20 need to be 21, I have to move Manually 230 balloons....:/ Is there any way that I can link between the Text in the balloon to the index No.? |
![]() |
|