Microsoft Office Forums

Go Back   Microsoft Office Forums > >

Reply
 
Thread Tools Display Modes
  #1  
Old 02-06-2018, 09:37 AM
Iris12 Iris12 is offline How can I change the order of book pages of an existing book to left-to-right instead of right to le Windows 7 64bit How can I change the order of book pages of an existing book to left-to-right instead of right to le Office 2013
Novice
How can I change the order of book pages of an existing book to left-to-right instead of right to le
 
Join Date: Feb 2018
Posts: 1
Iris12 is on a distinguished road
Thumbs up How can I change the order of book pages of an existing book to left-to-right instead of right to le

Hi, I have a booklet already with right-to-left layout in Publisher 2013, 28 pages with images on each page.
It's a book that's already been printed as a booklet (that's why it has a page number which is a multiple of 4), and it's in Hebrew right now.

I now want to turn it into an English book with its English translation, otherwise keeping the same order of pages and images.

I.e.: I want the whole book to be set to left-to-right view, so that when I view it in 2-page view, I will see page 1 on its own (front cover), then page 2 on the left, page 3 on the right opposite it, then page 4 on the left, page 5 on the right opposite it, etc.

I have quite a lot of experience with publisher but cannot find a way to do this, would really appreciate some advice on this.

I tried going to where you can set the default viewing order to left-to-right through "file" - options - but
a). it hasn't worked, even after I closed and reopened my document,
b). I don't really want to change the default but only this specific publication.

sum up: it's important to me because I have a number of other such booklets to turn from Hebrew into English and I cannot properly work on them if the page layout remains right to left, it makes it very difficult to work with and see what's happening and how the opposite pages match.

thanks in advance,

I.
Reply With Quote
Reply

Tags
layout, page order, publisher



Similar Threads
Thread Thread Starter Forum Replies Last Post
How can I change the order of book pages of an existing book to left-to-right instead of right to le Alternating top margins for odd and even pages-Not for a book, so please don't suggest mirrored BenBren Word 6 06-01-2016 06:29 AM
Resorting a Book Index from names to pages roderh Excel Programming 0 01-25-2015 02:40 PM
Suppress Header/Footer on Blank Pages in Book SQLUSA Word 5 08-19-2012 03:51 PM
How can I change the order of book pages of an existing book to left-to-right instead of right to le Need to keep pages intact for a book style doc alphabravo Word 2 07-27-2010 09:53 AM
Book layout in Word or Adobe - 2 pages automatically on the screen msbytes Word 4 04-05-2010 08:22 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:28 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft