  #1  
Old 02-22-2011, 03:45 PM
caz46 caz46 is offline Duration does not change Windows 7 32bit Duration does not change Office 2007
Advanced Beginner
Duration does not change
 
Join Date: Feb 2011
Posts: 73
caz46 is on a distinguished road
Default Duration does not change

Hi,

I am using Project 2007 and am trying to reduce some task durations. My tasks are all effort driven and fixed units but if I increase the resource units the task duration does not change.

Please advise me if I am doing something wrong.



Thanks
Reply With Quote
  #2  
Old 05-17-2011, 07:51 AM
OTPM OTPM is offline Duration does not change Windows 7 32bit Duration does not change Office 2010 32bit
Expert
 
Join Date: Apr 2011
Location: West Midlands
Posts: 981
OTPM is on a distinguished road
Default

Hi caz46
It sound like something to do with the way your version of Project is configured. I have just tried it on Project 2007 stand alone version and it works fine.
Sorry I could not help further.
Tony
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Work not changing duration benoldays Project 0 02-14-2011 08:21 PM
Duration changes fail to update work effort Panteledes Project 6 05-25-2010 02:27 PM
Duration does not change how to set up plan with no duration info? stats Project 1 04-11-2010 04:12 PM
custom formula for duration ericfons Project 0 03-23-2010 01:18 PM
Duration does not change Having problems with Duration calculations. bgane Project 1 03-20-2006 06:36 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 01:37 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft