jraward jraward is offline Any way to display the portion of a task that is split by non-working time in a different colour? Windows 7 64bit Any way to display the portion of a task that is split by non-working time in a different colour? Office 2016
Novice
Any way to display the portion of a task that is split by non-working time in a different colour?
 
Join Date: Mar 2019
Posts: 2
jraward is on a distinguished road
Default Any way to display the portion of a task that is split by non-working time in a different colour?




Is this possible to do automatically? I need to illustrate that the task isn't 16 weeks long (like the first image), it's 12 weeks with a 4wk break driven by the non-working time (red shading) which I've mocked up in the second image.

The task may also move, but the non-working time won't (which is specific to this task).

I know I can manually split the task (which I've shown in the 3rd image) however when the programme changes that split will move from the non-working time and I need to manually drag it around.
Reply With Quote
 



Similar Threads
Thread Thread Starter Forum Replies Last Post
Any way to display the portion of a task that is split by non-working time in a different colour? Do not split task on task level Mattias Project 5 02-17-2017 09:36 AM
Any way to display the portion of a task that is split by non-working time in a different colour? Creating a task similar to Working Time exceptions jaywizz1 Project 1 11-04-2016 10:30 AM
Any way to display the portion of a task that is split by non-working time in a different colour? Employee Turnover by Department/Month split between Voluntary/Involuntary - Full-time/Part-time CPSmith Excel 1 03-26-2016 02:48 AM
Any way to display the portion of a task that is split by non-working time in a different colour? Remove time portion in date angie.chang Excel 4 06-13-2012 09:45 AM
how to make the task starts next day if no time enough today(task can not be split) duraid Project 1 10-25-2010 08:31 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:01 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft