How to identify which tasks in a plan have a relationship with a specific section of the plan?
 
Join Date: May 2016
Posts: 32
miless2111s is on a distinguished road
Default How to identify which tasks in a plan have a relationship with a specific section of the plan?

I have a complex plan and am looking to extract some sections of it into sub plans. I don't like links between plans (preferring to manually control these using named dependencies). Before I just rip out a section of the plan I prefer to check to see what relationships the rest of the plan have on this section.

To do this I have designed a simple highlight filter that is meant to highlight tasks that have a dependency on a defined section of the plan. The filter is:

Predecessors - is less than or equal to - "less than:"? (enter 12)

AND Predecessors - is greater than or equal to - "greater than:"? (enter 9)

This seems to work most of the time however a task that has the predecessor 10,2 doesn't trigger the highlight. Changing it to 10 does trigger and then when I change it back to 10,2 it stays triggered! Note that I am re-applying the filter with each change.



I am not used to MSP being inconsistent in this way, I would have expected the 10,2 to trigger in the first place OR not trigger the second time.

Note that most tasks have multiple dependencies and this doesn't appear to impact the filter.

Does anyone know what is going on here? Do you have any tricks or techniques to identify the impact of a section of the plan before removing it?

TIA
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Can I show only views, tables etc in use in a specific plan miless2111s Project 4 04-19-2021 05:40 AM
Plan on hold best practice Mattias Project 3 02-14-2017 05:19 AM
Can i create a plan without using dates? Ronin Project 3 02-14-2017 02:46 AM
Displaying Ghost Tasks in a Master Plan OTPM Project 1 08-02-2016 02:51 PM
How to identify which tasks in a plan have a relationship with a specific section of the plan? how to set up plan with no duration info? stats Project 1 04-11-2010 04:12 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 12:36 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft