Question Using Material Resources and % Complete to Calculate Cost-to-Date

I have tried (unsuccessfully) several times in the past to get MS Project to align with the workflow/billing process for my company.



We invoice exclusively on prorated material costs-- in our case, how many cubic yards of material was moved from the start of a project to current date.

Normally, (outside of MS Project,) we would either use % Complete of the total material OR (units moved)/(total units).

Since MSP doesn't accept additional decimals in the % Complete field, I assume there would be a way to input however many units of material were moved to date to calculate Cost to Date, but I cannot for the life of me figure it out.

Any help would be greatly appreciated!
Reply With Quote
Reply

Tags
% complete, cost, material



Similar Threads
Thread Thread Starter Forum Replies Last Post
How to number pictures and resources in word for automatic numbering, when adding material between?? Retko Word 1 11-30-2015 10:10 AM
Using Material Resources and % Complete to Calculate Cost-to-Date Different cost rates for resources for different projects linked to the Resource Pool Hanloujohn3515 Project 1 10-31-2015 11:58 AM
Using Material Resources and % Complete to Calculate Cost-to-Date Assigning Resources and percent complete jwindholz2725 Project 1 02-24-2014 10:56 AM
Using Material Resources and % Complete to Calculate Cost-to-Date Cannot type in the cost field of the assign resources dialogue box cldonley Project 1 02-05-2014 07:42 AM
Using Material Resources and % Complete to Calculate Cost-to-Date excel cannot complete this task with available resources - vlookup Taisho Excel 4 01-27-2012 03:09 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:23 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft