Valor Planejado (COTA)
 
Join Date: Jun 2020
Posts: 4
Jairoriele is on a distinguished road
Arrow Valor Planejado (COTA)

Defini os pacotes de trabalho com suas durações. Informe os valores destes pacotes. Atualizo a data de status do projeto, além de ter criado a Linha de Base. Contudo, no campo COTA os valores estão zerados, sendo que até a data de status há valores atribuídos. O que estou deixando de fazer?





I defined the work packages with their durations. Enter the values of these packages. I update the project status date, in addition to creating the Baseline. However, in the COTA field, the values are zeroed, and until the status date there are values assigned. What am I failing to do?
Reply With Quote
Reply

Tags
cota, custos, valor planejado

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Macro date and match valor cg1980 Excel Programming 0 04-12-2011 09:38 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:13 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft