Hi,



I am currently building a schedule for a construction project. I am assigning resources to task and I am looking to maintain an average crew size. I have "Crew 1" and the max units are 12. I am trying to maintain a bell curve with respect to my man-power. Can anyone help me out or point me in the right direct?

Thanks,
Reply With Quote
  #2  
Old 04-11-2019, 04:46 AM
Guloluseus Guloluseus is offline Level Resources Windows 7 64bit Level Resources Office 2010 32bit
Competent Performer
 
Join Date: Mar 2013
Posts: 168
Guloluseus is on a distinguished road
Default

I think you are looking at it from the wrong angle. Write the programme as a logical sequence, and the resourcing will come from that.
Once you have that, look at what tasks would benefit from more labour, and add them in IF there is an overall benefit. Similarly, if 2 tasks can be carried out at the same time then programme them as such.

If you try to programme to a constraint on labour, chances are that the project will not go as planned. More important to write an achievable programme then optimise where it has benefit, than aim for a theoretical target.

also bear in mind that risk should be factored in to the programme, and this will upset labour levels, If you have 12 units available, dont go over 8 or 10, as overruns will place strains on resources you havent got.
this also allows for snagging during the job, which will also consume manpower units. backend works will also more than likely end up being late, and need more resource than planned.

Concentrate on a writing a cohesive, logical programme, and th erest will come from that
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Level Resources Applied Styles to Headings in Multi-Level List; now ALL second level headings are 1.XX NNL Word 1 08-09-2017 02:52 PM
Level Resources Automatic numbered lists - Cannot create new point at level 2, after making level 3 points. icor1031 Word 1 01-14-2016 09:24 PM
Level Resources Resources - only allow users to select from resources pool grazi Project 1 04-04-2014 11:12 AM
Level Resources Auto-level resources for parallel tasks with fixed work cineasta Project 5 11-21-2013 01:03 PM
Level Resources Heading level numbering in 2010 - wrong after second header level 1 taran Word 3 07-08-2013 01:12 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 07:23 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft