Old 09-27-2018, 06:34 AM
Tris Tris is offline Test Bay Scheduling Windows 10 Test Bay Scheduling Office 2016
Novice
Test Bay Scheduling
 
Join Date: Sep 2018
Posts: 4
Tris is on a distinguished road
Default Test Bay Scheduling

Hi Everyone



Let me set the scene

We have a test bay that is structured to test 3 different types of gas turbine and I have allocated 3 resources Test Bed 1, Test Bed 2 and Test Bed 3 for the 3 different types

Typically we employ 3 technicians which have the resource Test Techs

Simplistically the test program is
  1. Receive Engine
  2. Install Engine
  3. Test Engine
  4. Remove Engine
  5. Dispatch Engine

My problem is that when we're testing an engine on one bed we cannot be installing one on another due to Health and Safety concerns should the running engine have a dangerous failure

How can I/is it possible to make MS Project show that clash if it happens

Cheers

Tris
Reply With Quote
  #2  
Old 09-27-2018, 11:47 PM
Patrick Geers Patrick Geers is offline Test Bay Scheduling Windows 7 64bit Test Bay Scheduling Office 2016
Novice
 
Join Date: Sep 2018
Location: Eindhoven
Posts: 9
Patrick Geers is on a distinguished road
Default

Create a resource TestBays.
For installing/removing set the units to 100% divided by the number of bays.
In your case 33%, so all three bays can simultiously be installed and/or removed.
For testing set the units to 100% so no other activity can be occur.
I think this should work unless tests can run simultaniously.
Reply With Quote
  #3  
Old 09-28-2018, 03:16 AM
Tris Tris is offline Test Bay Scheduling Windows 10 Test Bay Scheduling Office 2016
Novice
Test Bay Scheduling
 
Join Date: Sep 2018
Posts: 4
Tris is on a distinguished road
Default

That might do the trick Patrick - I'll give it a go

Thanks

Tris
Reply With Quote
  #4  
Old 09-28-2018, 03:40 AM
Tris Tris is offline Test Bay Scheduling Windows 10 Test Bay Scheduling Office 2016
Novice
Test Bay Scheduling
 
Join Date: Sep 2018
Posts: 4
Tris is on a distinguished road
Default

Actually the more I think about this solution the better I like it!!
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Student's t-test (T.TEST): how to get p value? seanspotatobusiness Excel 1 07-20-2018 05:46 AM
Help please with scheduling jheald12 Excel 0 12-02-2017 06:50 AM
Scheduling question mayachen1@gmail.com Project 4 05-06-2017 03:32 PM
Test Bay Scheduling Nurse Scheduling Help nishatian1 Excel 3 12-01-2015 02:22 PM
Scheduling of Tasks asmith1977 Project 0 01-27-2011 11:13 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 10:30 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft