![]() |
|
#1
|
|||
|
|||
|
Hi All,
Is there a way to design a re-usable schedule that can change based on the answer to questions e.g. Have a schedule that can be used to build a house. It's detailed and covers everything from planning permission to adding a garage. However the 2nd house already has planning permission and doesn't need a garage, so remove those sections. We appear to be re-building schedules all the time which leads to variances in quality. I would like to build a master schedule that is linked to a questionnaire i.e.: 1: Is planning permission required? 2: 2,3 or 4 Bed house? 3: Is a garage required Take these answers and dynamically change the schedule based on the output of the questionnaire. Is this possible? Regards, Scott |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| dynamic dependent drop down list based on input with reference to a two column table | jwan142 | Excel | 4 | 05-23-2018 08:15 AM |
| Automatically color the right options in red based on the answers provided | puff | Word VBA | 4 | 12-26-2017 10:36 PM |
Need to create a "Yes/NO" Form and based on answers prompt for informatin
|
jaradani | Word | 4 | 10-12-2014 09:42 PM |
Conditional Formatting based on dynamic Date
|
Modifier1000 | Excel | 2 | 09-12-2014 08:53 AM |
| dynamic charts based on mail merge fields | jwajehee | Mail Merge | 0 | 10-05-2011 09:47 AM |