Microsoft Office Forums

Go Back   Microsoft Office Forums > >

Reply
 
Thread Tools Display Modes
  #1  
Old 04-29-2018, 06:05 PM
jim44 jim44 is offline Baseline Slippage showing incorrect date Windows 7 64bit Baseline Slippage showing incorrect date Office 2007
Novice
Baseline Slippage showing incorrect date
 
Join Date: Apr 2018
Posts: 1
jim44 is on a distinguished road
Default Baseline Slippage showing incorrect date


Hi, I am new to MS Project, I was looking at my latest project and the flow chart on the right hand side of the screen was showing the slippage lines which indicated 01/01/1984 as the baseline date, does anyone know why this is happening?
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Baseline Slippage showing incorrect date Year date not showing at bottom of chart. snowboarder2 Excel 4 02-28-2017 05:13 PM
my excel 2010 line chart has a secondary axis. Its horizontal date axis is incorrect. jalea148 Excel 3 01-06-2017 09:04 AM
How to create statis Baseline date columns Ross Jackson Project 3 12-17-2015 04:00 PM
flag to indicate finish date does not equal baseline finish date TCB Project 3 08-06-2014 02:49 PM
Baseline Slippage showing incorrect date Group by Baseline month view - Incorrect task grouping stct Project 1 04-01-2013 12:43 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 01:53 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft