Old 12-04-2017, 08:52 PM
Nadine67 Nadine67 is offline Use Excel Working Time Calendar Windows 8 Use Excel Working Time Calendar Office 2013
Novice
Use Excel Working Time Calendar
 
Join Date: Dec 2017
Posts: 2
Nadine67 is on a distinguished road
Default Use Excel Working Time Calendar

Hello and thank you for any attention my post may receive.



Windows 8.1
Project 2013 (365)

This is my very first post on this forum...and I am new to MS Project.

I have multiple resources on multiple rosters and it would be easier for the Project Administrator to manage a calendar in excel and import it to Project. Is this possible? And if so is there an previous post with instruction on how to do so?

Thank you and have a great day.
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tasks Switch to Non-Working Days on Working Calendar danelloc Project 3 10-02-2017 12:38 PM
Calendar Meeting Changing Time sebbero Outlook 0 05-22-2013 07:18 AM
Change the time displayed in the Calendar holland Outlook 0 02-08-2012 05:34 AM
Calendar time zone issue DaMann Outlook 0 05-18-2011 11:41 AM
Use Excel Working Time Calendar Non-default working time problem Asterix Project 4 03-02-2010 01:08 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 05:25 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft