Hi guys,



I am having trouble assigning equipment for my different tasks that I have. I'll give you an exemple. I have a construction project. In it I have tasks that require the use of the crane. Now I want to allocate the crane as an equipment. Ok, I go to the ressource sheet, I make a new ressource as work, call it "crane". Now we are getting to the part where it gets tricky. The crane is not used for the entire duration of the task, but just at the beginning. When I allocate the crane to a task, Project considers it to be employed for the duration of the task. I need to assign it just for a certain amount of time. Does anyone have any idea how it can be done ?

D.
Reply With Quote
  #2  
Old 07-26-2017, 11:30 AM
Guloluseus Guloluseus is offline Assigning equipment Windows 7 64bit Assigning equipment Office 2010 32bit
Competent Performer
 
Join Date: Mar 2013
Posts: 168
Guloluseus is on a distinguished road
Default

Simplest way s to create an additional task and allocate resources. In your example, create a task called "cranage" immediately above the main task and starting at the same time (start to start) and allocate the crane to that only.

Generally if you allocate a resource, it is seen as being required for the duration of the task - its logical. If a task resource is required for a shorter time, then it is effectively a separate task.
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Assigning equipment how to enter equipment resources benson.wallace Project 5 03-15-2023 01:43 PM
Assigning equipment Formula to work out equipment hire based on a minimum hire period. mpaino Excel 7 07-18-2016 04:08 AM
Issue regarding calculating costs of rental equipment TheCarrotcake Project 3 06-08-2014 02:14 PM
assiging equipment as resource ketanco Project 3 06-10-2012 03:32 AM
Assigning equipment Managing equipment and person operating equipment ProfessorGilligan1 Project 1 04-12-2012 12:29 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:18 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft