#1
|
|||
|
|||
Integrating Bill Of Materials (BOM)
I'm creating an engineering project for building a machine. The machine is composed of parts and components grouped into assemblies and sub-assemblies. My project is capturing the build process at the 'build assembly' level. I have resources (workers) assigned to assemble or build individual parts, but my question is: is there a way I can integrate my bill of materials into my project? I'd like a task (which is build this assembly) to list the part/component associated with the assembly. Some of those parts/components have attributes with them, like needs to be made, bought out of house, Solidworks drawing number, etc. My first thought is to treat parts like Resources and list them as 'Materials'. I've made a custom Resource View and called it BOM.
tldr: Has anyone integrated a Bill of Materials (BOM) into their project? Do you have any helpful strategies? |
#2
|
|||
|
|||
I would use the material resources if you need to track to that level. If you are mostly interested in costs, another option is to assign the cost of the materials as a fixed cost.
|
Thread Tools | |
Display Modes | |
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Materials/Work Costs Per task | cool28uo | Project | 1 | 02-01-2015 03:59 PM |
Tracking materials over time | Guloluseus | Project | 3 | 04-02-2013 11:08 AM |
Integrating PPP with drawing program | captsalmon | PowerPoint | 0 | 01-28-2013 06:17 PM |
Integrating multiple PST files | panda234 | Outlook | 2 | 01-11-2012 07:48 PM |
Integrating Templates into Toolbar | thirty5 | Outlook | 0 | 08-12-2010 07:52 AM |