Campelliann Campelliann is offline Project does not distribute work evenly between the days Windows 8 Project does not distribute work evenly between the days Office 2016
Novice
Project does not distribute work evenly between the days
 
Join Date: Jan 2017
Posts: 6
Campelliann is on a distinguished road
Default Project does not distribute work evenly between the days

Hi,



I have an over allocated resource, in the resource sheet project sometimes distributes evenly between the days the remaining amount of work, but then in the last day the value is completely diferrent for example. 9, 9 , 9 , 20 (h).

Why does this happen?

Thanks in advance,
Reply With Quote
  #2  
Old 01-09-2017, 06:01 PM
JulieS JulieS is offline Project does not distribute work evenly between the days Windows 7 64bit Project does not distribute work evenly between the days Office 2013
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

Is the task Fixed Duration? Does the resource have a special working calendar? Is the task manually scheduled?
Reply With Quote
Reply

Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
VBA to distribute all columns evenly within tables NorthSuffolk Word VBA 3 09-23-2017 05:28 PM
Calculating 6.5hr work days altja Project 3 02-10-2014 03:11 PM
12 hour work days (shifts) John Franklin Project 22 11-12-2013 03:19 PM
Project Days mah_dahshan Project 1 12-17-2012 04:27 AM
Calendar work days in advance paol:o Outlook 4 05-27-2012 07:23 PM

Other Forums: Access Forums

All times are GMT -7. The time now is 09:16 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft