Microsoft Office Forums

Go Back   Microsoft Office Forums > >

Reply
 
Thread Tools Display Modes
  #1  
Old 10-25-2016, 06:26 PM
bijukn1 bijukn1 is offline Critical path Windows 10 Critical path Office 2016
Novice
Critical path
 
Join Date: Oct 2016
Posts: 1
bijukn1 is on a distinguished road
Default Critical path


Hi Anyone can help me to do the critical path
Reply With Quote
  #2  
Old 10-26-2016, 04:58 PM
Guloluseus Guloluseus is offline Critical path Windows 7 64bit Critical path Office 2010 32bit
Competent Performer
 
Join Date: Mar 2013
Posts: 168
Guloluseus is on a distinguished road
Default

You need to give a bit more information, I am afraid.
the critical path is not something that you make, it is the set of tasks that have no float on them, or to put it another way, if any of them slip by any time, the finish date will change.
Generally there will be always be a critical path. the main reasons for not seeing one are constrained dates (these will skew the programme), or set start and finish dates that are further apart than the duration of the programmed items. In this case, generally you would add a float bar- this links from any task that does not have a successor (something happening after it) and links to the finish date. The duration of this can be set so that it takes up all the slack in the programme, and this will then allow the critical path to be shown.

If you need more help, then an example would be ideal, or a bit more explanation as to the exact problem.

hope this helps.
Reply With Quote
  #3  
Old 11-04-2016, 10:31 AM
JulieS JulieS is offline Critical path Windows 7 64bit Critical path Office 2013
Expert
 
Join Date: Dec 2011
Location: New England
Posts: 1,693
JulieS will become famous soon enough
Default

Critical path is calculated in Project for you. You can view early start, early finish, late start and late finish dates as well as Total slack (float).
Reply With Quote
Reply



Similar Threads
Thread Thread Starter Forum Replies Last Post
Critical path not displayed on Gantt Chart JPolise Project 12 05-19-2021 11:50 AM
Critical Path workload forecasts Planner18 Project 1 07-01-2015 01:34 PM
Critical Path Length ketanco Project 5 03-15-2013 01:12 PM
critical path starting in future ketanco Project 5 07-27-2012 02:50 PM
Critical path Critical Path w/ 2 Calendars AndreT Project 6 07-27-2011 11:22 AM

Other Forums: Access Forums

All times are GMT -7. The time now is 02:10 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
MSOfficeForums.com is not affiliated with Microsoft